For the latest batch 3 official pointers, source editions and explicit gaps, see nationwide rules and coverage. Earlier pilot and batch 2 records below remain available separately; they are not complete current compliance guidance.
Eight narrow summaries checked November 5, 2026 (Pacific Time), not legal advice, permission to operate or a complete 50-state database. Employer requirements differ from rental-counter ID policies. Read the actual rule, its coverage and exceptions; state-plan, local and jobsite requirements can add obligations.
Additional official state summaries — batch 2
26 narrowly scoped summaries/resources, not completed state compliance. See coverage and gaps for every state/DC · JSON · CSV.
TX: homeowner excavation notice
Texas RRC homeowner guidance says to contact 811 two business days before digging, excluding weekends and holidays, including backyard projects.
Narrow source summary, not legal advice, excavation permission or a complete compliance checklist. Check current law, coverage, exceptions, positive responses, markings and the actual ticket start time. This page is homeowner guidance; do not infer every statutory exception or ticket rule.
Texas RRC Pipeline Damage Prevention — Resources for Homeowners · Official source · Checked 2026-11-05 (Pacific Time).
NC: excavation notice and response
For covered nonemergency excavation or demolition, G.S. 87-122 requires notice at least three full working days before the proposed start date for work not involving a subaqueous facility. Working days exclude Saturday, Sunday and state legal holidays. The statute separately addresses positive responses and special conditions.
Narrow source summary, not legal advice, excavation permission or a complete compliance checklist. Check current law, coverage, exceptions, positive responses, markings and the actual ticket start time. Subaqueous facilities, emergencies and extraordinary circumstances have separate provisions.
N.C. G.S. 87-117(23), 87-121 and 87-122 · Official source · Checked 2026-11-05 (Pacific Time).
IN: excavation notice
Indiana IURC guidance says everyone who digs must contact Indiana 811 at least two full working days before starting the project, including small projects.
Narrow source summary, not legal advice, excavation permission or a complete compliance checklist. Check current law, coverage, exceptions, positive responses, markings and the actual ticket start time. The summary does not define the full working-day calculation or all exemptions.
Indiana IURC — Call Before You Dig Law; IC 8-1-26 · Official source · Checked 2026-11-05 (Pacific Time).
PA: excavation notice
Pennsylvania PUC guidance says homeowners and contractors must contact PA One Call at least three business days before digging or excavation, and allow facility owners to mark buried lines.
Narrow source summary, not legal advice, excavation permission or a complete compliance checklist. Check current law, coverage, exceptions, positive responses, markings and the actual ticket start time. This guidance excerpt does not supply the full maximum-notice or complex-project rules; those remain unasserted here.
Pennsylvania PUC — PA One Call 811 · Official source · Checked 2026-11-05 (Pacific Time).
NY: one call jurisdiction and training resource
New York DPS identifies Part 753/Code Rule 53 as the underground-facility protection rules and identifies separate one-call centers for the NYC/Long Island counties and the rest of New York. The page also links excavator certification resources.
Narrow source summary, not legal advice, excavation permission or a complete compliance checklist. Check current law, coverage, exceptions, positive responses, markings and the actual ticket start time. No numeric notice window is inferred from this page, and its certification resource is not represented as a universal machine-operator license.
New York DPS — Underground Damage Prevention · Official source · Checked 2026-11-05 (Pacific Time).
WA: excavation notice guidance
Washington UTC guidance says to request an 811 locate at least two business days before planned digging. It advises premarking the planned area and careful hand exposure near marked utilities.
Narrow source summary, not legal advice, excavation permission or a complete compliance checklist. Check current law, coverage, exceptions, positive responses, markings and the actual ticket start time. This web guidance is not the full statute or a complete current working-day/ticket-life calculation.
Washington UTC — Call Before You Dig · Official source · Checked 2026-11-05 (Pacific Time).
WI: locate request and no show
Wisconsin PSC guidance tells excavators to avoid ground disturbance until utilities are marked and describes a three-working-day/72-hour process excluding weekends and holidays. The ticket start date/time matters; a no-show relocate can be requested if the utility fails to respond by that time.
Narrow source summary, not legal advice, excavation permission or a complete compliance checklist. Check current law, coverage, exceptions, positive responses, markings and the actual ticket start time. Do not reduce the guidance to an unconditional 72 elapsed hours or treat a no-show request as permission to excavate.
Wisconsin PSC — Diggers Hotline · Official source · Checked 2026-11-05 (Pacific Time).
MN: excavation notice
Minnesota DPS guidance says to notify Gopher State One Call at least 48 hours before excavation, excluding the day of call/submission, weekends and holidays. The guidance applies to machine-powered work and small hand-tool projects.
Narrow source summary, not legal advice, excavation permission or a complete compliance checklist. Check current law, coverage, exceptions, positive responses, markings and the actual ticket start time. The waiting calculation is not simply 48 elapsed hours.
Minnesota DPS — Gopher State One Call; Minnesota Statutes Chapter 216D · Official source · Checked 2026-11-05 (Pacific Time).
NJ: excavation notice guidance
New Jersey BPU guidance says anyone planning to dig should provide at least three business days notice by calling 811, including home and commercial projects.
Narrow source summary, not legal advice, excavation permission or a complete compliance checklist. Check current law, coverage, exceptions, positive responses, markings and the actual ticket start time. Source is a dated official guidance release, checked now; no current maximum-notice window or complete 2026 statutory audit is claimed.
New Jersey BPU — National Safe Digging Month release, April 3, 2024 · Official source · Checked 2026-11-05 (Pacific Time).
KS: excavation notice
Kansas Corporation Commission April 2026 guidance says excavators and homeowners must make an 811 request at least two working days before a digging project. Utility locators mark approximate underground-line locations.
Narrow source summary, not legal advice, excavation permission or a complete compliance checklist. Check current law, coverage, exceptions, positive responses, markings and the actual ticket start time. No maximum notice period or ticket validity is invented.
Kansas Corporation Commission — Safe Digging Month, April 1, 2026 · Official source · Checked 2026-11-05 (Pacific Time).
MO: call before dig guidance
Missouri PSC guidance says planned excavation, from work in a home yard to a commercial project, requires notifying Missouri 811 so underground facilities can be marked.
Narrow source summary, not legal advice, excavation permission or a complete compliance checklist. Check current law, coverage, exceptions, positive responses, markings and the actual ticket start time. This page does not supply a numeric notice window; it remains unknown in this summary.
Missouri PSC — Call Before You Dig · Official source · Checked 2026-11-05 (Pacific Time).
AZ: official underground facilities resource
Arizona Corporation Commission provides an Underground Facilities Law resource and excavation-related safety material. Use the Commission source and the applicable one-call instructions to establish the actual duties before digging.
Narrow source summary, not legal advice, excavation permission or a complete compliance checklist. Check current law, coverage, exceptions, positive responses, markings and the actual ticket start time. Resource pointer only: no notice window, tolerance zone or completed state-law analysis was extracted.
Arizona Corporation Commission — Underground Facilities Law · Official source · Checked 2026-11-05 (Pacific Time).
OH: excavation notice current statute
Ohio Revised Code 3781.28(A), effective June 9, 2026, requires covered notice at least two working days, excluding the notification day, but not more than sixteen calendar days before excavation. The section contains specific exceptions and additional duties.
Narrow source summary, not legal advice, excavation permission or a complete compliance checklist. Check current law, coverage, exceptions, positive responses, markings and the actual ticket start time. Read divisions (C) through (F) and other applicable sections; do not substitute the older generic 48-hour wording.
Ohio Revised Code 3781.28(A), effective June 9, 2026 · Official source · Checked 2026-11-05 (Pacific Time).
CA: powered industrial truck training
California 8 CCR 3668 requires covered employers to ensure powered-industrial-truck operator competence through training and evaluation before operation, subject to the section conditions. Training combines formal instruction, practical training and workplace evaluation. Performance evaluation is required at least once every three years; specified events trigger refresher training.
Employment-safety requirement, not a universal retail rental license or complete safety program. Agricultural operations defined by section 3437 are expressly excepted. Check scope, other rules, actual truck and jobsite.
California 8 CCR 3668(a), (b), (d), (f) · Official source · Checked 2026-11-05 (Pacific Time).
TX: transport permit process
TxDMV says vehicles/loads exceeding Texas legal size and weight limits need an OS/OW permit and authorized route when applicable before travel on public roads. Applicants must know exact vehicle/load dimensions and weight.
Official process/resource summary, not a permit, route clearance, CDL determination or complete legal threshold table. Exact loaded configuration, route, bridges, local restrictions, permit type and current agency instructions control; numeric limits and fees are not inferred.
TxDMV — Oversize/Overweight Permits · Official source · Checked 2026-11-05 (Pacific Time).
CT: transport permit process
Connecticut DOT says OS/OW permits for nonconforming vehicles can limit routes, operating times, speed and other conditions. Permit applications are processed through the Connecticut CVO WebPortal.
Official process/resource summary, not a permit, route clearance, CDL determination or complete legal threshold table. Exact loaded configuration, route, bridges, local restrictions, permit type and current agency instructions control; numeric limits and fees are not inferred.
Connecticut DOT — Oversize/Overweight Vehicle Permits · Official source · Checked 2026-11-05 (Pacific Time).
HI: transport permit process
Hawaii DOT permit guidance covers proposed operation or transport of oversized/overweight vehicles and loads on state highways. Applications require the requested information and sketches of wheel arrangements, dimensions and load distribution.
Official process/resource summary, not a permit, route clearance, CDL determination or complete legal threshold table. Exact loaded configuration, route, bridges, local restrictions, permit type and current agency instructions control; numeric limits and fees are not inferred.
Hawaii DOT — Oversized and Overweight Vehicles on State Highways · Official source · Checked 2026-11-05 (Pacific Time).
OK: transport permit process
Oklahoma ODOT size-and-weight permit guidance calls for a company profile before ordering permits and links special-movement applications, escort information, maps and bridge information.
Official process/resource summary, not a permit, route clearance, CDL determination or complete legal threshold table. Exact loaded configuration, route, bridges, local restrictions, permit type and current agency instructions control; numeric limits and fees are not inferred.
Oklahoma ODOT — Size and Weight Permits · Official source · Checked 2026-11-05 (Pacific Time).
MN: transport permit process
MnDOT says an OSOW permit is required for vehicles/loads exceeding legal size or weight limits moved upon or across Minnesota highways/roads. Permits may give specific routes to avoid bridge, height, weight, construction and other constraints.
Official process/resource summary, not a permit, route clearance, CDL determination or complete legal threshold table. Exact loaded configuration, route, bridges, local restrictions, permit type and current agency instructions control; numeric limits and fees are not inferred.
MnDOT — Oversize/Overweight Permits · Official source · Checked 2026-11-05 (Pacific Time).
MT: transport permit process
Montana MDT says equipment/loads exceeding legal width, length, height or weight require a permit; temporary fuel/licensing permits may also be needed if not registered in Montana. It directs online orders to MT eTRIPS and reminds carriers to check route construction and load/speed restrictions.
Official process/resource summary, not a permit, route clearance, CDL determination or complete legal threshold table. Exact loaded configuration, route, bridges, local restrictions, permit type and current agency instructions control; numeric limits and fees are not inferred.
Montana MDT — Commercial Motor Carrier Permits · Official source · Checked 2026-11-05 (Pacific Time).
AK: transport permit process
Alaska DOT commercial-vehicle permit guidance directs carriers to the statewide AKSWOOP permit service and provides application, legal-size/weight and application-information resources.
Official process/resource summary, not a permit, route clearance, CDL determination or complete legal threshold table. Exact loaded configuration, route, bridges, local restrictions, permit type and current agency instructions control; numeric limits and fees are not inferred.
Alaska DOT — Commercial Vehicle Permits · Official source · Checked 2026-11-05 (Pacific Time).
NC: transport permit process
NCDOT directs oversize/overweight permit customers to PIMS. Its published update says faxed applications stopped being accepted August 1, 2025. The page also provides current permit and route-condition resources.
Official process/resource summary, not a permit, route clearance, CDL determination or complete legal threshold table. Exact loaded configuration, route, bridges, local restrictions, permit type and current agency instructions control; numeric limits and fees are not inferred.
NCDOT — Oversize/Overweight Permits · Official source · Checked 2026-11-05 (Pacific Time).
WI: transport permit process
Wisconsin DOT provides distinct single-trip and multiple-trip OSOW permit information, forms, route restrictions and county highway contacts. Check route-specific restrictions rather than assuming a permit clears every road.
Official process/resource summary, not a permit, route clearance, CDL determination or complete legal threshold table. Exact loaded configuration, route, bridges, local restrictions, permit type and current agency instructions control; numeric limits and fees are not inferred.
Wisconsin DOT — OSOW General Information · Official source · Checked 2026-11-05 (Pacific Time).
VT: transport permit process
Vermont DMV provides commercial trucking permit/routing resources, including single-trip permits for vehicles exceeding statutory weight or dimension limits and survey-route applications.
Official process/resource summary, not a permit, route clearance, CDL determination or complete legal threshold table. Exact loaded configuration, route, bridges, local restrictions, permit type and current agency instructions control; numeric limits and fees are not inferred.
Vermont DMV — Commercial Vehicle Permits · Official source · Checked 2026-11-05 (Pacific Time).
KY: transport permit process
Kentucky Transportation Cabinet provides separate resources for overweight/over-dimensional permits, legal dimensions and escort requirements. Follow the applicable resource before arranging a move.
Official process/resource summary, not a permit, route clearance, CDL determination or complete legal threshold table. Exact loaded configuration, route, bridges, local restrictions, permit type and current agency instructions control; numeric limits and fees are not inferred.
Kentucky Transportation Cabinet — Overweight/Over-Dimensional resources · Official source · Checked 2026-11-05 (Pacific Time).
NC: excavation employee training
North Carolina G.S. 87-123 places employee education, training and documentation duties on covered business/trade excavators, locators and operators. Independent contractors train their own employees. The section calls for OSHA 1926 compliance and direction by a competent person for excavation.
Applies to the Article-specific covered activities, not a universal rental-counter license or a substitute for an equipment-specific safety program.
N.C. G.S. 87-123(a)-(d) · Official source · Checked 2026-11-05 (Pacific Time).