{"schema_version":"1.0","count":26,"notes":["26 narrow official-state summaries/resources; not complete 50-state legal coverage. Some records intentionally provide only a resource pointer and no numeric rule. Original eight pilot summaries remain separate."],"records":[{"id":"batch2-tx-811","jurisdiction":"TX","topic":"homeowner-excavation-notice","summary":"Texas RRC homeowner guidance says to contact 811 two business days before digging, excluding weekends and holidays, including backyard projects.","citation":"Texas RRC Pipeline Damage Prevention — Resources for Homeowners","scope_note":"Narrow source summary, not legal advice, excavation permission or a complete compliance checklist. Check current law, coverage, exceptions, positive responses, markings and the actual ticket start time. This page is homeowner guidance; do not infer every statutory exception or ticket rule.","source_url":"https://www.rrc.texas.gov/pipeline-safety/pipeline-damage-prevention-program/resources-for-homeowners/","checked_at":"2026-11-05T23:25:29-08:00","trust_level":"official-source-summary","robots_check":{"allowed":true,"checked_at":"2026-11-05T23:28:58-08:00","robots_status":200,"robots_url":"https://www.rrc.texas.gov/robots.txt","parser":"Protego wildcard-aware; fail closed on unreadable robots","same_host":true}},{"id":"batch2-nc-811","jurisdiction":"NC","topic":"excavation-notice-and-response","summary":"For covered nonemergency excavation or demolition, G.S. 87-122 requires notice at least three full working days before the proposed start date for work not involving a subaqueous facility. Working days exclude Saturday, Sunday and state legal holidays. The statute separately addresses positive responses and special conditions.","citation":"N.C. G.S. 87-117(23), 87-121 and 87-122","scope_note":"Narrow source summary, not legal advice, excavation permission or a complete compliance checklist. Check current law, coverage, exceptions, positive responses, markings and the actual ticket start time. Subaqueous facilities, emergencies and extraordinary circumstances have separate provisions.","source_url":"https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/ByArticle/Chapter_87/Article_8A.html","checked_at":"2026-11-05T23:25:29-08:00","trust_level":"official-source-summary","robots_check":{"allowed":true,"checked_at":"2026-11-05T23:29:02-08:00","robots_status":200,"robots_url":"https://www.ncleg.gov/robots.txt","parser":"Protego wildcard-aware; fail closed on unreadable robots","same_host":true}},{"id":"batch2-in-811","jurisdiction":"IN","topic":"excavation-notice","summary":"Indiana IURC guidance says everyone who digs must contact Indiana 811 at least two full working days before starting the project, including small projects.","citation":"Indiana IURC — Call Before You Dig Law; IC 8-1-26","scope_note":"Narrow source summary, not legal advice, excavation permission or a complete compliance checklist. Check current law, coverage, exceptions, positive responses, markings and the actual ticket start time. The summary does not define the full working-day calculation or all exemptions.","source_url":"https://www.in.gov/iurc/pipeline-safety-division/regulation-of-gas-operators/call-before-you-dig-law/","checked_at":"2026-11-05T23:25:33-08:00","trust_level":"official-source-summary","robots_check":{"allowed":true,"checked_at":"2026-11-05T23:28:59-08:00","robots_status":200,"robots_url":"https://www.in.gov/robots.txt","parser":"Protego wildcard-aware; fail closed on unreadable robots","same_host":true}},{"id":"batch2-pa-811","jurisdiction":"PA","topic":"excavation-notice","summary":"Pennsylvania PUC guidance says homeowners and contractors must contact PA One Call at least three business days before digging or excavation, and allow facility owners to mark buried lines.","citation":"Pennsylvania PUC — PA One Call 811","scope_note":"Narrow source summary, not legal advice, excavation permission or a complete compliance checklist. Check current law, coverage, exceptions, positive responses, markings and the actual ticket start time. This guidance excerpt does not supply the full maximum-notice or complex-project rules; those remain unasserted here.","source_url":"https://www.puc.pa.gov/pipeline-safety/damage-prevention-enforcement/pa-one-call-811/","checked_at":"2026-11-05T23:25:33-08:00","trust_level":"official-source-summary","robots_check":{"allowed":true,"checked_at":"2026-11-05T23:28:57-08:00","robots_status":200,"robots_url":"https://www.puc.pa.gov/robots.txt","parser":"Protego wildcard-aware; fail closed on unreadable robots","same_host":true}},{"id":"batch2-ny-811","jurisdiction":"NY","topic":"one-call-jurisdiction-and-training-resource","summary":"New York DPS identifies Part 753/Code Rule 53 as the underground-facility protection rules and identifies separate one-call centers for the NYC/Long Island counties and the rest of New York. The page also links excavator certification resources.","citation":"New York DPS — Underground Damage Prevention","scope_note":"Narrow source summary, not legal advice, excavation permission or a complete compliance checklist. Check current law, coverage, exceptions, positive responses, markings and the actual ticket start time. No numeric notice window is inferred from this page, and its certification resource is not represented as a universal machine-operator license.","source_url":"https://dps.ny.gov/underground-damage-prevention","checked_at":"2026-11-05T23:25:29-08:00","trust_level":"official-source-summary","robots_check":{"allowed":true,"checked_at":"2026-11-05T23:29:09-08:00","robots_status":200,"robots_url":"https://dps.ny.gov/robots.txt","parser":"Protego wildcard-aware; fail closed on unreadable robots","same_host":true}},{"id":"batch2-wa-811","jurisdiction":"WA","topic":"excavation-notice-guidance","summary":"Washington UTC guidance says to request an 811 locate at least two business days before planned digging. It advises premarking the planned area and careful hand exposure near marked utilities.","citation":"Washington UTC — Call Before You Dig","scope_note":"Narrow source summary, not legal advice, excavation permission or a complete compliance checklist. Check current law, coverage, exceptions, positive responses, markings and the actual ticket start time. This web guidance is not the full statute or a complete current working-day/ticket-life calculation.","source_url":"https://www.utc.wa.gov/public-safety/pipeline-safety/call-you-dig","checked_at":"2026-11-05T23:25:35-08:00","trust_level":"official-source-summary","robots_check":{"allowed":true,"checked_at":"2026-11-05T23:29:03-08:00","robots_status":200,"robots_url":"https://www.utc.wa.gov/robots.txt","parser":"Protego wildcard-aware; fail closed on unreadable robots","same_host":true}},{"id":"batch2-wi-811","jurisdiction":"WI","topic":"locate-request-and-no-show","summary":"Wisconsin PSC guidance tells excavators to avoid ground disturbance until utilities are marked and describes a three-working-day/72-hour process excluding weekends and holidays. The ticket start date/time matters; a no-show relocate can be requested if the utility fails to respond by that time.","citation":"Wisconsin PSC — Diggers Hotline","scope_note":"Narrow source summary, not legal advice, excavation permission or a complete compliance checklist. Check current law, coverage, exceptions, positive responses, markings and the actual ticket start time. Do not reduce the guidance to an unconditional 72 elapsed hours or treat a no-show request as permission to excavate.","source_url":"https://psc.wi.gov/Pages/ForConsumers/DiggersHotline.aspx","checked_at":"2026-11-05T23:25:35-08:00","trust_level":"official-source-summary","robots_check":{"allowed":true,"checked_at":"2026-11-05T23:29:05-08:00","robots_status":404,"robots_url":"https://psc.wi.gov/robots.txt","parser":"Protego wildcard-aware; fail closed on unreadable robots","same_host":true}},{"id":"batch2-mn-811","jurisdiction":"MN","topic":"excavation-notice","summary":"Minnesota DPS guidance says to notify Gopher State One Call at least 48 hours before excavation, excluding the day of call/submission, weekends and holidays. The guidance applies to machine-powered work and small hand-tool projects.","citation":"Minnesota DPS — Gopher State One Call; Minnesota Statutes Chapter 216D","scope_note":"Narrow source summary, not legal advice, excavation permission or a complete compliance checklist. Check current law, coverage, exceptions, positive responses, markings and the actual ticket start time. The waiting calculation is not simply 48 elapsed hours.","source_url":"https://dps.mn.gov/divisions/ops/homeowners/gsoc","checked_at":"2026-11-05T23:26:28-08:00","trust_level":"official-source-summary","robots_check":{"allowed":true,"checked_at":"2026-11-05T23:29:01-08:00","robots_status":200,"robots_url":"https://dps.mn.gov/robots.txt","parser":"Protego wildcard-aware; fail closed on unreadable robots","same_host":true}},{"id":"batch2-nj-811","jurisdiction":"NJ","topic":"excavation-notice-guidance","summary":"New Jersey BPU guidance says anyone planning to dig should provide at least three business days notice by calling 811, including home and commercial projects.","citation":"New Jersey BPU — National Safe Digging Month release, April 3, 2024","scope_note":"Narrow source summary, not legal advice, excavation permission or a complete compliance checklist. Check current law, coverage, exceptions, positive responses, markings and the actual ticket start time. Source is a dated official guidance release, checked now; no current maximum-notice window or complete 2026 statutory audit is claimed.","source_url":"https://www.nj.gov/bpu/newsroom/2024/approved/20240403.html","checked_at":"2026-11-05T23:26:29-08:00","trust_level":"official-source-summary","robots_check":{"allowed":true,"checked_at":"2026-11-05T23:29:09-08:00","robots_status":200,"robots_url":"https://www.nj.gov/robots.txt","parser":"Protego wildcard-aware; fail closed on unreadable robots","same_host":true}},{"id":"batch2-ks-811","jurisdiction":"KS","topic":"excavation-notice","summary":"Kansas Corporation Commission April 2026 guidance says excavators and homeowners must make an 811 request at least two working days before a digging project. Utility locators mark approximate underground-line locations.","citation":"Kansas Corporation Commission — Safe Digging Month, April 1, 2026","scope_note":"Narrow source summary, not legal advice, excavation permission or a complete compliance checklist. Check current law, coverage, exceptions, positive responses, markings and the actual ticket start time. No maximum notice period or ticket validity is invented.","source_url":"https://www.kcc.ks.gov/news-4-1-26","checked_at":"2026-11-05T23:26:29-08:00","trust_level":"official-source-summary","robots_check":{"allowed":true,"checked_at":"2026-11-05T23:29:07-08:00","robots_status":404,"robots_url":"https://www.kcc.ks.gov/robots.txt","parser":"Protego wildcard-aware; fail closed on unreadable robots","same_host":true}},{"id":"batch2-mo-811","jurisdiction":"MO","topic":"call-before-dig-guidance","summary":"Missouri PSC guidance says planned excavation, from work in a home yard to a commercial project, requires notifying Missouri 811 so underground facilities can be marked.","citation":"Missouri PSC — Call Before You Dig","scope_note":"Narrow source summary, not legal advice, excavation permission or a complete compliance checklist. Check current law, coverage, exceptions, positive responses, markings and the actual ticket start time. This page does not supply a numeric notice window; it remains unknown in this summary.","source_url":"https://psc.mo.gov/General/Call_Before_You_Dig","checked_at":"2026-11-05T23:26:29-08:00","trust_level":"official-source-summary","robots_check":{"allowed":true,"checked_at":"2026-11-05T23:29:07-08:00","robots_status":200,"robots_url":"https://psc.mo.gov/robots.txt","parser":"Protego wildcard-aware; fail closed on unreadable robots","same_host":true}},{"id":"batch2-az-811","jurisdiction":"AZ","topic":"official-underground-facilities-resource","summary":"Arizona Corporation Commission provides an Underground Facilities Law resource and excavation-related safety material. Use the Commission source and the applicable one-call instructions to establish the actual duties before digging.","citation":"Arizona Corporation Commission — Underground Facilities Law","scope_note":"Narrow source summary, not legal advice, excavation permission or a complete compliance checklist. Check current law, coverage, exceptions, positive responses, markings and the actual ticket start time. Resource pointer only: no notice window, tolerance zone or completed state-law analysis was extracted.","source_url":"https://azcc.gov/safety/pipeline-safety/underground-facilities-law/1000","checked_at":"2026-11-05T23:26:28-08:00","trust_level":"official-source-summary","robots_check":{"allowed":true,"checked_at":"2026-11-05T23:29:04-08:00","robots_status":404,"robots_url":"https://azcc.gov/robots.txt","parser":"Protego wildcard-aware; fail closed on unreadable robots","same_host":true}},{"id":"batch2-oh-811-statute","jurisdiction":"OH","topic":"excavation-notice-current-statute","summary":"Ohio Revised Code 3781.28(A), effective June 9, 2026, requires covered notice at least two working days, excluding the notification day, but not more than sixteen calendar days before excavation. The section contains specific exceptions and additional duties.","citation":"Ohio Revised Code 3781.28(A), effective June 9, 2026","scope_note":"Narrow source summary, not legal advice, excavation permission or a complete compliance checklist. Check current law, coverage, exceptions, positive responses, markings and the actual ticket start time. Read divisions (C) through (F) and other applicable sections; do not substitute the older generic 48-hour wording.","source_url":"https://codes.ohio.gov/ohio-revised-code/section-3781.28","checked_at":"2026-11-05T23:33:25-08:00","trust_level":"official-source-summary","robots_check":{"allowed":true,"checked_at":"2026-11-05T23:33:26-08:00","parser":"Protego wildcard-aware","robots_status":200}},{"id":"batch2-ca-forklift","jurisdiction":"CA","topic":"powered-industrial-truck-training","summary":"California 8 CCR 3668 requires covered employers to ensure powered-industrial-truck operator competence through training and evaluation before operation, subject to the section conditions. Training combines formal instruction, practical training and workplace evaluation. Performance evaluation is required at least once every three years; specified events trigger refresher training.","citation":"California 8 CCR 3668(a), (b), (d), (f)","scope_note":"Employment-safety requirement, not a universal retail rental license or complete safety program. Agricultural operations defined by section 3437 are expressly excepted. Check scope, other rules, actual truck and jobsite.","source_url":"https://www.dir.ca.gov/title8/3668.html","checked_at":"2026-11-05T23:33:24-08:00","trust_level":"official-source-summary","robots_check":{"allowed":true,"checked_at":"2026-11-05T23:33:25-08:00","parser":"Protego wildcard-aware","robots_status":200}},{"id":"batch2-permit-tx","jurisdiction":"TX","topic":"transport-permit-process","summary":"TxDMV says vehicles/loads exceeding Texas legal size and weight limits need an OS/OW permit and authorized route when applicable before travel on public roads. Applicants must know exact vehicle/load dimensions and weight.","citation":"TxDMV — Oversize/Overweight Permits","scope_note":"Official process/resource summary, not a permit, route clearance, CDL determination or complete legal threshold table. Exact loaded configuration, route, bridges, local restrictions, permit type and current agency instructions control; numeric limits and fees are not inferred.","source_url":"https://www.txdmv.gov/motor-carriers/oversize-overweight-permits#:~:text=Oversize%2FOverweight%20Permits%20Vehicles%20and%20loads%20that%20exceed%20legal,a%20special%20permit.%20Texas%20Size%20%26%20Weight%20Limits","checked_at":"2026-11-05T23:27:22-08:00","trust_level":"official-source-summary","robots_check":{"allowed":true,"checked_at":"2026-11-05T23:29:04-08:00","robots_status":200,"robots_url":"https://www.txdmv.gov/robots.txt","parser":"Protego wildcard-aware; fail closed on unreadable robots","same_host":true}},{"id":"batch2-permit-ct","jurisdiction":"CT","topic":"transport-permit-process","summary":"Connecticut DOT says OS/OW permits for nonconforming vehicles can limit routes, operating times, speed and other conditions. Permit applications are processed through the Connecticut CVO WebPortal.","citation":"Connecticut DOT — Oversize/Overweight Vehicle Permits","scope_note":"Official process/resource summary, not a permit, route clearance, CDL determination or complete legal threshold table. Exact loaded configuration, route, bridges, local restrictions, permit type and current agency instructions control; numeric limits and fees are not inferred.","source_url":"https://portal.ct.gov/dot/permits/oversize-overweight-permits","checked_at":"2026-11-05T23:26:56-08:00","trust_level":"official-source-summary","robots_check":{"allowed":true,"checked_at":"2026-11-05T23:28:59-08:00","robots_status":200,"robots_url":"https://portal.ct.gov/robots.txt","parser":"Protego wildcard-aware; fail closed on unreadable robots","same_host":true}},{"id":"batch2-permit-hi","jurisdiction":"HI","topic":"transport-permit-process","summary":"Hawaii DOT permit guidance covers proposed operation or transport of oversized/overweight vehicles and loads on state highways. Applications require the requested information and sketches of wheel arrangements, dimensions and load distribution.","citation":"Hawaii DOT — Oversized and Overweight Vehicles on State Highways","scope_note":"Official process/resource summary, not a permit, route clearance, CDL determination or complete legal threshold table. Exact loaded configuration, route, bridges, local restrictions, permit type and current agency instructions control; numeric limits and fees are not inferred.","source_url":"https://hidot.hawaii.gov/highways/home/doing-business/guide-to-permits/oversized-and-overweight-vehicles-on-state-highways/","checked_at":"2026-11-05T23:26:57-08:00","trust_level":"official-source-summary","robots_check":{"allowed":true,"checked_at":"2026-11-05T23:29:00-08:00","robots_status":200,"robots_url":"https://hidot.hawaii.gov/robots.txt","parser":"Protego wildcard-aware; fail closed on unreadable robots","same_host":true}},{"id":"batch2-permit-ok","jurisdiction":"OK","topic":"transport-permit-process","summary":"Oklahoma ODOT size-and-weight permit guidance calls for a company profile before ordering permits and links special-movement applications, escort information, maps and bridge information.","citation":"Oklahoma ODOT — Size and Weight Permits","scope_note":"Official process/resource summary, not a permit, route clearance, CDL determination or complete legal threshold table. Exact loaded configuration, route, bridges, local restrictions, permit type and current agency instructions control; numeric limits and fees are not inferred.","source_url":"https://oklahoma.gov/odot/about-us/laws-and-rules/size-and-weight-permits.html","checked_at":"2026-11-05T23:27:21-08:00","trust_level":"official-source-summary","robots_check":{"allowed":true,"checked_at":"2026-11-05T23:29:01-08:00","robots_status":200,"robots_url":"https://oklahoma.gov/robots.txt","parser":"Protego wildcard-aware; fail closed on unreadable robots","same_host":true}},{"id":"batch2-permit-mn","jurisdiction":"MN","topic":"transport-permit-process","summary":"MnDOT says an OSOW permit is required for vehicles/loads exceeding legal size or weight limits moved upon or across Minnesota highways/roads. Permits may give specific routes to avoid bridge, height, weight, construction and other constraints.","citation":"MnDOT — Oversize/Overweight Permits","scope_note":"Official process/resource summary, not a permit, route clearance, CDL determination or complete legal threshold table. Exact loaded configuration, route, bridges, local restrictions, permit type and current agency instructions control; numeric limits and fees are not inferred.","source_url":"https://www.dot.state.mn.us/cvo/oversize/index.html","checked_at":"2026-11-05T23:27:08-08:00","trust_level":"official-source-summary","robots_check":{"allowed":true,"checked_at":"2026-11-05T23:29:00-08:00","robots_status":200,"robots_url":"https://www.dot.state.mn.us/robots.txt","parser":"Protego wildcard-aware; fail closed on unreadable robots","same_host":true}},{"id":"batch2-permit-mt","jurisdiction":"MT","topic":"transport-permit-process","summary":"Montana MDT says equipment/loads exceeding legal width, length, height or weight require a permit; temporary fuel/licensing permits may also be needed if not registered in Montana. It directs online orders to MT eTRIPS and reminds carriers to check route construction and load/speed restrictions.","citation":"Montana MDT — Commercial Motor Carrier Permits","scope_note":"Official process/resource summary, not a permit, route clearance, CDL determination or complete legal threshold table. Exact loaded configuration, route, bridges, local restrictions, permit type and current agency instructions control; numeric limits and fees are not inferred.","source_url":"https://www.mdt.mt.gov/business/mcs/permits.aspx","checked_at":"2026-11-05T23:27:11-08:00","trust_level":"official-source-summary","robots_check":{"allowed":true,"checked_at":"2026-11-05T23:29:05-08:00","robots_status":200,"robots_url":"https://www.mdt.mt.gov/robots.txt","parser":"Protego wildcard-aware; fail closed on unreadable robots","same_host":true}},{"id":"batch2-permit-ak","jurisdiction":"AK","topic":"transport-permit-process","summary":"Alaska DOT commercial-vehicle permit guidance directs carriers to the statewide AKSWOOP permit service and provides application, legal-size/weight and application-information resources.","citation":"Alaska DOT — Commercial Vehicle Permits","scope_note":"Official process/resource summary, not a permit, route clearance, CDL determination or complete legal threshold table. Exact loaded configuration, route, bridges, local restrictions, permit type and current agency instructions control; numeric limits and fees are not inferred.","source_url":"https://dot.alaska.gov/mscvc/pages/permits.shtml","checked_at":"2026-11-05T23:26:44-08:00","trust_level":"official-source-summary","robots_check":{"allowed":true,"checked_at":"2026-11-05T23:29:08-08:00","robots_status":200,"robots_url":"https://dot.alaska.gov/robots.txt","parser":"Protego wildcard-aware; fail closed on unreadable robots","same_host":true}},{"id":"batch2-permit-nc","jurisdiction":"NC","topic":"transport-permit-process","summary":"NCDOT directs oversize/overweight permit customers to PIMS. Its published update says faxed applications stopped being accepted August 1, 2025. The page also provides current permit and route-condition resources.","citation":"NCDOT — Oversize/Overweight Permits","scope_note":"Official process/resource summary, not a permit, route clearance, CDL determination or complete legal threshold table. Exact loaded configuration, route, bridges, local restrictions, permit type and current agency instructions control; numeric limits and fees are not inferred.","source_url":"https://connect.ncdot.gov/business/trucking/Pages/overpermits.aspx","checked_at":"2026-11-05T23:27:16-08:00","trust_level":"official-source-summary","robots_check":{"allowed":true,"checked_at":"2026-11-05T23:29:10-08:00","robots_status":200,"robots_url":"https://connect.ncdot.gov/robots.txt","parser":"Protego wildcard-aware; fail closed on unreadable robots","same_host":true}},{"id":"batch2-permit-wi","jurisdiction":"WI","topic":"transport-permit-process","summary":"Wisconsin DOT provides distinct single-trip and multiple-trip OSOW permit information, forms, route restrictions and county highway contacts. Check route-specific restrictions rather than assuming a permit clears every road.","citation":"Wisconsin DOT — OSOW General Information","scope_note":"Official process/resource summary, not a permit, route clearance, CDL determination or complete legal threshold table. Exact loaded configuration, route, bridges, local restrictions, permit type and current agency instructions control; numeric limits and fees are not inferred.","source_url":"https://wisconsindot.gov/Pages/dmv/com-drv-vehs/mtr-car-trkr/osowgeneral.aspx","checked_at":"2026-11-05T23:28:24-08:00","trust_level":"official-source-summary","robots_check":{"allowed":true,"checked_at":"2026-11-05T23:28:57-08:00","robots_status":404,"robots_url":"https://wisconsindot.gov/robots.txt","parser":"Protego wildcard-aware; fail closed on unreadable robots","same_host":true}},{"id":"batch2-permit-vt","jurisdiction":"VT","topic":"transport-permit-process","summary":"Vermont DMV provides commercial trucking permit/routing resources, including single-trip permits for vehicles exceeding statutory weight or dimension limits and survey-route applications.","citation":"Vermont DMV — Commercial Vehicle Permits","scope_note":"Official process/resource summary, not a permit, route clearance, CDL determination or complete legal threshold table. Exact loaded configuration, route, bridges, local restrictions, permit type and current agency instructions control; numeric limits and fees are not inferred.","source_url":"https://dmv.vermont.gov/CVO/permits","checked_at":"2026-11-05T23:27:24-08:00","trust_level":"official-source-summary","robots_check":{"allowed":true,"checked_at":"2026-11-05T23:28:59-08:00","robots_status":200,"robots_url":"https://dmv.vermont.gov/robots.txt","parser":"Protego wildcard-aware; fail closed on unreadable robots","same_host":true}},{"id":"batch2-permit-ky","jurisdiction":"KY","topic":"transport-permit-process","summary":"Kentucky Transportation Cabinet provides separate resources for overweight/over-dimensional permits, legal dimensions and escort requirements. Follow the applicable resource before arranging a move.","citation":"Kentucky Transportation Cabinet — Overweight/Over-Dimensional resources","scope_note":"Official process/resource summary, not a permit, route clearance, CDL determination or complete legal threshold table. Exact loaded configuration, route, bridges, local restrictions, permit type and current agency instructions control; numeric limits and fees are not inferred.","source_url":"https://drive.ky.gov/Motor-Carriers/Overweight-Over-Dimensional/Pages/default.aspx","checked_at":"2026-11-05T23:27:05-08:00","trust_level":"official-source-summary","robots_check":{"allowed":true,"checked_at":"2026-11-05T23:29:05-08:00","robots_status":200,"robots_url":"https://drive.ky.gov/robots.txt","parser":"Protego wildcard-aware; fail closed on unreadable robots","same_host":true}},{"id":"batch2-nc-excavation-training","jurisdiction":"NC","topic":"excavation-employee-training","summary":"North Carolina G.S. 87-123 places employee education, training and documentation duties on covered business/trade excavators, locators and operators. Independent contractors train their own employees. The section calls for OSHA 1926 compliance and direction by a competent person for excavation.","citation":"N.C. G.S. 87-123(a)-(d)","scope_note":"Applies to the Article-specific covered activities, not a universal rental-counter license or a substitute for an equipment-specific safety program.","source_url":"https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/ByArticle/Chapter_87/Article_8A.html","checked_at":"2026-11-05T23:25:29-08:00","trust_level":"official-source-summary","robots_check":{"allowed":true,"checked_at":"2026-11-05T23:29:02-08:00","robots_status":200,"robots_url":"https://www.ncleg.gov/robots.txt","parser":"Protego wildcard-aware; fail closed on unreadable robots","same_host":true}}],"dataset_title":"Additional official state summaries","scope_note":"26 narrow state summaries/resources, including Ohio notice changes effective June 9, 2026. Not complete legal guidance.","usage_note":"Public reference facts with source citations, not a grant of exclusive rights or a blanket CC0 license. Yard statements remain Unverified. Preserve provenance; see /sources/ for base-listing licenses.","publication_date":"2026-11-06","checked_date":"2026-11-05","checked_date_scope":"Latest record source-check date, not a complete refresh. Preserve each record and field timestamp."}